At JSPL sustainable steel production is a priority and, therefore, we work relentlessly to reduce our
impact on the environment. All our units are maintained as zero discharge units ensuring maximum
possible utilization of wastewater.
We have implemented systems to fulfil the applicable legal environmental protection requirements and
those of ISO9001, ISO14001 and OSHAS18001 at all our units. Our unit at Angul has been certified for
social accountability (SA 8000). Our power plant at Tamnar has recently won ISO 50001 certification.
Our systems operate on principles of minimizing pollution, wastages and energy usage during
manufacturing and maximizing the harmony between operations and surroundings.
JSPL's Production during FY 2013-14
Product. |
Production in FY 2013-14 (in MT) |
Production in FY 2012-13 (in MT) |
Sponge Iron |
13,19,985 |
13,19,976 |
Finished steel products |
21,53,613 |
21,43,750 |
Semi steel products |
28,85,779 |
30,23,974 |
Pellets |
41,48,974 |
40,42,025 |
Power |
5,643.95 million Kwh |
6,027.82 million Kwh |
Casting (Raipur) |
1,791 |
1,933 |
Machining (Raipur) |
14,033 |
12,510 |
Iron Ore mined (Tensa) |
5,41,000 |
5,64,000 |
Coal (Captive mines) |
59,99,000 |
59,99,000 |